Sunday
|
OFD Survey
With the new survey board completed, it remained only to rehang the old survey sheets on a temporary basis and
without the acetate sheet covering. Following the Working Week, a reprint of the existing survey was provided and
this was put up, together with the covering sheet. Longer term, we await the arrival of the new survey.
|
|
|
|
|
Ladies' Bedroom
The cork tile floor in Ladies' Bedroom had been lacquered the previous day and it was left to Norman and Kevin to
reassemble the bunks and make the place habitable for the following weekend.
The redecoration of the room was complete apart from making good the rendering over the new door lintel, another job
to be carried over to the next Working Week.
|
|
Gents toilets
Gents toilets were tidied up and some paint applied to the trapdoors. The area is now so salubrious that
people are likely to spend far longer in there than is strictly necessary.
The next Working Week plans to fit alarms which will sound when users exceed their allotted time.
|
|
|
|
The End
|
|