OFD Survey
With the new survey board completed, it remained only to rehang the old survey sheets on a temporary basis and without the acetate sheet covering.  Following the Working Week, a reprint of the existing survey was provided and this was put up, together with the covering sheet.  Longer term, we await the arrival of the new survey.

survey.jpg (141376 bytes)


ladiesbeds_4.jpg (213475 bytes)

Ladies' Bedroom
The cork tile floor in Ladies' Bedroom had been lacquered the previous day and it was left to Norman and Kevin to reassemble the bunks and make the place habitable for the following weekend.

The redecoration of the room was complete apart from making good the rendering over the new door lintel, another job to be carried over to the next Working Week.



Gents toilets
Gents toilets were tidied up and some paint applied to the trapdoors.  The area is now so salubrious that people are likely to spend far longer in there than is strictly necessary.

The next Working Week plans to fit alarms which will sound when users exceed their allotted time.

bogtest.jpg (147290 bytes)


firestarter.jpg (242627 bytes)

Clearing up
As most people went home, it was left to the faithful few to complete the massive job of clearing up the mess created by the week's work.

When everything had been tidied and as far as possible swept up, much of the debris and the tree cuttings were burnt.

fire.jpg (189490 bytes)


witchboard.jpg (207243 bytes)

The final chapter
As ever, thanks to all those who gave up their time to help with the Working Week.  For those who missed it, there will almost certainly be another one next year .....

grolsch_2.jpg (210967 bytes)


The End

the_end.jpg (228562 bytes)