Working Week 2003

a compilation by Chris Grimmett

Introduction      Saturday      Sunday      Monday      Tuesday      Wednesday      Thursday      Friday      Saturday      Sunday

What was achieved

10_front.jpg (191646 bytes)
No. 10 front bedroom
ladiesstairs.jpg (150613 bytes)
Ladies' stairwell
marriedbathroom.jpg (173941 bytes)
Married Bathroom
firedoor.jpg (144940 bytes)
Fire doors
 
ladiesbedroom.jpg (164624 bytes)
Ladies' Bedroom
buildingstores.jpg (223163 bytes)
Building Stores
campelectrics.jpg (161370 bytes)
Electricity to camping area
patioseat.jpg (202434 bytes)
Patio table
 
water.jpg (249496 bytes)
Water to camping area
gents_2.jpg (155532 bytes)
Gents toilets
pointing.jpg (203376 bytes)
Repointing of front wall
ladiesbathroom.jpg (151621 bytes)
Ladies' Bathroom
 
8_back.jpg (186104 bytes)
No.8 rear bedroom
sill.jpg (153484 bytes)
Window sills
gentschanging.jpg (139719 bytes)
Gents changing room
surveyfinal.jpg (161701 bytes)
OFD survey