What was achieved
A considerable number of jobs were completed; there are pictures of
some of these below. The list included the following:-
| |
|
|
|
| Fencing repaired |
Stump roof leaks repaired |
Rubbish disposed of |
Many minor repairs |
| More coat hooks installed |
Fire door seals replaced |
Window sills tiled |
Pit cover secured |
| Pictures rehung in Dining Room |
Extra photo boards fitted |
Long Common Room fire repaired |
Dining Room seat repaired |
| Digging Stores tidied up |
Workshop treated for woodworm |
Delay timers fitted to some
lights |
Draught excluders fitted to
doors |
| Garden walls repaired |
Numerous rooms repainted |
Ovens and microwaves cleaned |
Shelves in Ladies Overflow |
| |
|
|
|
Kitchen drain cover |
Long Common Room lights |
Laboratory shelving |
Laboratory clear up |
| |
|
|
|
Outside sinks splashback |
Gents Showers |
Flagstones to alleyway |

Storage in front No.10 |
| |
|
|
|
No.3 bunk room |
 No.3 bunk room |

New Locker Room |
 Ladies'
Showers |
| |
|
|
|
No.9 bunk ends |
Dumper truck brakes |
Chimney repairs |
Stump garden stile | |