Working Week 2007

a compilation by Chris Grimmett

Introduction      Saturday      Sunday      Monday      Tuesday      Wednesday      Thursday      Friday      Saturday 

What was achieved

A considerable number of jobs were completed; there are pictures of some of these below.  The list included the following:-

 
Fencing repaired Stump roof leaks repaired Rubbish disposed of Many minor repairs
More coat hooks installed Fire door seals replaced Window sills tiled Pit cover secured
Pictures rehung in Dining Room Extra photo boards fitted Long Common Room fire repaired Dining Room seat repaired
Digging Stores tidied up Workshop treated for woodworm Delay timers fitted to some lights Draught excluders fitted to doors
Garden walls repaired Numerous rooms repainted Ovens and microwaves cleaned Shelves in Ladies Overflow
 

Kitchen drain cover

Long Common Room lights

Laboratory shelving

Laboratory clear up
 

Outside sinks splashback

Gents Showers

Flagstones to alleyway

Storage in front No.10
 

No.3 bunk room

No.3 bunk room

New Locker Room

Ladies' Showers
 

No.9 bunk ends

Dumper truck brakes

Chimney repairs

Stump garden stile